WAIMANGAROA RIVER BRIDGE

UNDERPINNING - WESTPORT

DURATION 

May 2021 – May 2022

CLIENT

NZTA

CONSULTANT/DESIGNER

WSP

VALUE

$1,600,000.00

The upgrading of the SH67 Waimangaroa River Bridge project had required Hunter Civil to complete the strengthening of the existing piles/pile caps and installing rock armouring to the existing banks.

The works involved installing 1050 mm diameter bored piles to a depth of 22m at the end of each existing pile cap. The new piles extended out of the ground and got incorporated into the existing pile caps via a reinforced concrete "skin" encasement. To incorporate the piles into the existing cap, many reinforcement bars had to be drilled into or grouted through the pile caps. After the completion of works, the bridge foundation was strengthened and better protected for years ahead.