COLOMBO ST UTILITY TUNNEL - CHRISTCHURCH


DURATION
Apr 2023 – Apr 2024
CLIENT
Christchurch City Council
CONSULTANT/DESIGNER
WSP
VALUE
$1,250,000.00
Hunter Civil completed critical upgrades to the CCC watermain network within a below-ground utility tunnel running parallel to the Colombo Street overbridge between Moorhouse Avenue and Carlyle Street, in Sydenham.
The construction work involved:
-
Building a new entrance pit to the tunnel at the Carlyle St entry point,
-
Removal of existing asbestos watermain and replacement with a new watermain.
-
Removal of redundant gas main.
-
Deep excavation connection points to existing watermain outside of the tunnel.
The project was a technically challenging project with a range of complex risk profiles, including confined space entry work, specialist gas main removal work, asbestos control works and Level 2 traffic management at a high-profile CBD site.